The
subject of the contract is, among other things, the construction of
a roughly 600 m long double-track tram line, the repair of the ceiling
slab of the vestibule of the Muzeum metro station, the construction
of a retention and accumulation tank for rainwater and the planting
of new trees. The estimated value of the contract is CZK 1.25bn.
The construction is expected to start in H1 2023. It should last
a maximum of 48 months.
Source: CIA NEWS