Panattoni, in cooperation with the Accolade group, is preparing the
construction of a robotic e-commerce centre at a brownfield near
Kojetín, the district of Přerov. The multi-storey logistics building with
a floor area of 52,000 m2 will be built on the site of former sludge
fields. The project in the value of CZK 3bn could offer up to 2,000
jobs at peak hours. It will likely be completed by the end of 2022.
The complex offers connections to the D1 motorway and is located
near a railway corridor. The industrial zone will be designed in such
a way that its operation minimizes environmental impacts, including
the so-called carbon footprint.
www.cianews.cz